Custom-engineered control solutions for mobile mining equipment

Allplant designs and manufactures custom low-voltage electrical control cabinets for mobile mining machinery.

From initial design and component selection through to manufacture, programming, testing, installation and commissioning, our team provides a complete solution tailored to the equipment and its operating environment.

Complete in-house capability

Our electrical control cabinet services include:

  • Low-voltage 9–32V DC control cabinet design
  • Electrical design and technical drawings
  • Component selection
  • Stainless-steel cabinet manufacture
  • Electrical wiring
  • System programming
  • Testing and quality-control inspections
  • Installation and commissioning
  • Existing cabinet replacement and upgrades
  • Reverse engineering

Our cabinets can be designed for drilling rigs, excavators and other heavy mobile mining equipment.

Reverse engineering

When original designs or drawings are unavailable, Allplant can reverse engineer an existing electrical control cabinet to develop a replacement or updated solution.

Our team examines the existing cabinet, its wiring, components and operating functions before producing the technical drawings and documentation required for manufacture.

This capability helps equipment owners replace ageing, damaged or obsolete control systems while maintaining the machine’s required functionality.

Built for demanding mining environments

Allplant generally uses high IP-rated stainless-steel enclosures to provide dependable protection in harsh mining conditions.

High-quality German-manufactured electrical components are selected for their reliability, durability and performance. Components can also be selected to suit the specific requirements of the equipment and customer.

Quality and compliance

Allplant’s electrical control cabinets are designed, manufactured and tested under our ISO 9001-certified quality management system.

All work is completed to the MDG 15 standard for mobile and transportable mining equipment.

Testing and quality control

Every electrical control cabinet undergoes comprehensive testing and quality-control inspections before delivery.

All testing and QC processes are completed under Allplant’s strict ISO 9001 quality standards. Advanced Cirris electrical testing equipment is used to verify wiring accuracy, electrical integrity and reliability.

Our testing process helps identify potential faults before installation and ensures the completed cabinet meets the project’s design and operational requirements.

One accountable partner

Allplant manages the entire project—from initial design and reverse engineering through to manufacture, programming, testing, installation and commissioning.

Our combination of mobile mining experience, complete in-house capability, robust stainless-steel construction, high-quality components and strict quality controls delivers dependable control solutions designed to reduce equipment downtime.

Need a new, replacement or upgraded control cabinet?

Speak with Allplant about a custom-engineered electrical control cabinet for your mobile mining equipment.

Contact our team today to discuss your requirements.

Powered by Quality. Driven by Uptime.